Case Study
What is the system capacity, and which is the bottleneck department?
How much slack (unused capacity) is available in other departments?
How much system capacity can be gained by adding capacity to the bottleneck?
What are the key factors that determine when to add capacity?
Why would an organization want to reduce its capacity?
Make and include calculations. Your initial post should be 200-250 words.
Food Processing Company produces light snacks that can be heated in a microwave. The following steps are included in theprocess:
Steps Description Capacity (Units/Hour)
1 Prepare food 200
2 Measure and place in plastic pouch 175
3 Prepare cardboard box 200
4 Insert pouch into box 300
5 Shrink-wrap box 200
FOR YOUR ASSIGNMENTS TO BE DONE AT A CHEAPER PRICE PLACE THIS ORDER OR A SIMILAR ORDER WITH US NOW