. You are required to calculate permanent actions for the office building from figure 1 for:
– beams AD, BE and EH,
– columns A, B, D and E at section 1 and section 2
Fig. 1
Beams and columns are made by concrete with a density of 2400 kg/m3.
Assume for this exercise that:
– cross section for beams is 250 ? 500 mm,
– cross section for columns is 500 ? 500 mm,
– concrete floor height is 150 mm.
TO GET YOUR ASSIGNMENTS DONE AT A CHEAPER PRICE,PLACE YOUR ORDER WITH US NOW