Home / Essays / Data

Data

Data
Project Assignment to Complete
Read the Team Assignment instructions below and follow these directions:

1. Review the Ballard Integrated Managed Services, Inc. (BIMS), Part 1 case study overview attachment.

2. Provide a 265 word response for the 2 bullet points below.

Present the BIMS situation as an overview–problem, purpose, research questions, and hypotheses.
Describe the instrument used for data collection.

Team Assignment Instructions

Prepare a 700- to 1,050-word written report along with a 5- to 7-slide Microsoft® PowerPoint® presentation for the senior management team or stakeholders of your RES/351 research project to present your findings.

Address the following:

· Present the chosen situation as an overview—problem, purpose, research questions, and hypotheses.

· Describe the instrument used for data collection.

· Identify types of data—quantitative, quantitative, or both—and how the data is collected.

· Identify the level of measurement for each of the variables involved in the study.

· Code the data if you have not done so. Describe how the data is coded and evaluate the procedure used.

· Clean the data by eliminating the data input errors made.

· Draw conclusions about appropriateness of the data to meet the purpose of the study.

FOR YOUR ASSIGNMENTS TO BE DONE AT A CHEAPER PRICE PLACE THIS ORDER OR A SIMILAR ORDER WITH US NOW

Leave a Reply

WPMessenger